Macias & Associates was contracted to provide professional surveying services in connection with route survey for the City of San Antonio – Western Extension B Sewer Main Improvements Project.  The project consists of a proposed 24” sanitary sewer line and is approximately 16,300 lineal feet long. The limits of the surveys were 50’ wide corridor along the Interstate Highway 10 right of way between Boerne Stage Road and Old Camp Bullis Road.  Macias prepared a route survey showing trees per City of San Antonio Ordinance, the right of way lines, existing improvements and utilities on the surface and the record underground utilities of the subject areas for the purpose of constructing a 24” sanitary sewer line. Macias also prepared 15 easement sketches and legal descriptions for permanent/temporary sanitary sewer easements and right of way takes.