Macias & Associates located critical environmental features. Conducted a boundary, tree (6” trunk diameter and larger), topographic and utility survey of an approximately 12 acre tract of land which is to be the new Raw Water Pump Station Site. Conducted a survey of 2 possible land fill areas on the WTP site. Staked out the new alignment of the proposed tunnel. Provided easement sketches and legal descriptions of the possible vacation of the existing Pedernales Electric Easement and the future location of the Pedernales Electric Easement. Located four streams in preserve area to the west of the WTP site. Performed balance of tree and topography survey on the WTP site. Located approximately 3,000 trees.